Home TabResidents TabBusiness TabVisiting TabMap Tab
A to Z of Services  Letter A Letter B Letter C Letter D Letter E Letter F Letter G Letter H Letter I Letter J Letter K Letter L Letter M Letter N Letter O Letter P Letter Q Letter R Letter S Letter T Letter U Letter V Letter W Letter X Letter Y Letter Z
You are here
 Home >  Environment >  Streetpride >  Highway Structures >
This is a photogragh of Birchwood Footbridge

Highway Structures

New!

The winner  of the competition to design the proposed footbridge over the Sheffield Parkway has been announced. For more details and artist's impressions of the finished bridge, please see the This is an internal link icon. Parkway Footbridge page.

The Service We Provide

Streetpride is responsible for maintaining highway structures, such as road bridges, footbridges, subways, culverts and retaining walls on the public highway and on definitive footpaths. Definitive footpaths are those footpaths shown on the  This is an internal link icon. Definitive Map.

In order to keep highway structures in a well maintained and safe condition, we have a team of engineers who carry out regular inspections and ensure that action is taken about:-

  • structural defects
  • graffiti on subways
  • dangerous retaining walls
  • embankment slips

We provide This is an internal link icon. advice to hauliers about the routing of abnormally heavy loads through the borough.

The Service You Can Expect

We aim to ensure that highway users can be assured of their safety when crossing rivers, railways and other obstacles to the highway, that highway structures are well maintained and that their appearance is in keeping with their surroundings.

The Service We Achieve

All bridges and subways receive a structural inspection at least every two years.

Subways are regularly cleaned of graffiti and, in the case of reported offensive graffiti, within 24 hours of notification on working days.

Schedule of Recent and Current Schemes

2004/05

Grafton New Bridge - Replacement of corroded steel sheet piles
Chantry Bridge - Concrete repairs
Treeton Lane - Retaining Wall Backfilling
Cramfit Road Bridge - Implementation of weight restriction

2005/06

Highfield Lane Bridge - New bridge construction
The Crofts, Swinton - Reconstruction of retaining wall
Eldon Road Footbridge - Installation of non-slip surfacing
Aldwarke Lane Bridges - Bridge joint repairs

2006/07

Tinsley Marshalling Bridge - Major repairs
Manvers Footbridge, Wath - General repairs
Wickersley Footbridge - Stair tread repairs

2007/08

Todwick Road Bridge - New bridge construction. The reconstruction of Todwick Road Bridge near Dinnington was the Highway Structures team's major project from November 2006 to Autumn 2007. For details, please see the This is an internal link icon. Todwick Road Bridge page.
Whitelea Road Bridge, Swinton - Bridge infill scheme
Laughton Common Road Bridge- Bridge infill scheme

How to Get In Touch

This is an internal link icon. Contact Streetpride to report a bridge, subway or retaining wall problem

This is a back to top of page icon.